【答案解析】1.基础的模板工程量
[1.2×0.3×4+(1.2-0.25×2)×0.3×4]m
2
×9=20.52m
2
2.现浇梁的模板工程量
L
1
=[(9-0.2×2)×(0.3+0.6×2)×6×4]m
2
=309.6m
2
L
2
=[(6-0.2×2)×(0.3+0.4×2)×6×4]m
2
=147.84m
2
总计:(309.6+147.84)m
2
=457.44m
2
3.柱的模板工程量
(1)柱子四周的表面积
[0.4×4×(13.2+2×0-0.3-0.3)×9]m
2
=210.24m
2
(2)柱与L
1
连接的重叠面积
(0.3×0.6×6×2×4)m
2
=8.64m
2
(3)柱与L
2
连接的重叠面积
(0.3×0.4×6×2×4)m
2
=5.76m
2