根据《建筑基坑支护技术规程》(JGJ 120—99)第4.4.4条计算
ιf=ιtsin(45°-φ/2)/sin(45°+θ+φ/2)
=(6+0.45)×sin(45°-20°/2)/sin(45°+15°+20°/2)
=3.94m