单选题
A project team is in the design stage of a new mountain bike prototype. The team is in the process of identifying which type of frame and material will provide high performance at a low cost. Which of the following is the MOST likely technique used to determine these variables?
- A) Benefit/cost analysis.
- B) Ishikawa diagram.
- C) Design of experiments.
- D) System flow chart.