单选题
Interest is steadily spreading from a minority of enthusiasts in developing renewable sources of energy—wind, wave and solar power, tidal and geothermal energy. Additional support for them has come with a proposal to explore the untapped sources of hydro-electric power in Scotland. The details are presented by Mr. William Manser in a study called "The Case for an Inquiry into Hydro-Electric Generation in the North of Scotland" He calls for an expert committee to look at the developments possible for hydro-electric sites and, more important, for means of financing them. There is a clear industrial connection in Mr. Manser's study because it was done for the Federation of Civil Engineering Contractors; hydro-electric schemes, by definition, have a large civil engineering component in them. Mr. Manser estimates that wind power could theoretically provide more than 7 per cent of electricity supply in the United Kingdom, provided suitable sites for generators could be found. However, the practical viability of wind power generation is not likely to be understood until 1990. Other developments using renewable energy sources are also at an early stage as far as their commercial possibilities are concerned, he believes. The best developed and most suitable form of renewable energy is, in his view, hydro-power. The technology has been developed over centuries and is still progressing. At present it is the cheapest form of electricity generation. Mr. Manser examined past surveys of the north of Scotland and identified several as suitable for hydro-electric generation. Those are in the remote areas, usually of great natural beauty. But Mr. Manser says a well-designed dam can be impressive in itself. It is also possible to make installations as unobtrusive as possible, to the point of burying parts of them. Hydro-generation involves no water pollution, smoke creation or unsightly stocking-out yards. The main trouble, appearing from his report, is financing an undertaking which has a heavy initial capital cost, and very low running costs. However, Mr. Manser does not see that as an unfamiliar position for the electricity industry. He cites the proposed construction of the new nuclear power station at Sizewell in Suffolk, which will have a high initial capital cost. The argument as Sizewell that the reason for the expenditure is that the capital will provide a benefit in lower costs and higher returns in the long-term, applies equally to hydro-electric generation.
单选题
The main subject of this passage is the ______. A. conservation of energy B. high costs of energy sources C. recycling of resources D. energy generated by water power
【正确答案】
D
【答案解析】这是一道要点题。全文都是在介绍Mr.Manser进行的水力发电的研究。因此答案选D。
单选题
From the passage we understand that Mr. Manser's study was ______. A. presented by a financial committee B. part of a civil engineering contract C. commissioned by a professional organization D. written in conjunction with an expert committee
【正确答案】
C
【答案解析】从第三段的开头…it was done for the Federation of Civil Engineering Contractors可知这项研究是受土木工程承包商协会委托而进行的。因此四个选项中C是正确答案。
单选题
What drawback is there to the provision of wind power generation? A. The supply method is not yet understood. B. It's nonviable proposition. C. There is a lack of suitable sites. D. Theoretical application is still needed.
单选题
The advantage of hydro-electric power is that it ______. A. does not damage the environment B. is relatively easy to install C. requires little or no maintenance D. is more suitable for remote areas
【正确答案】
A
【答案解析】由Hydro-generation involves no water pollution, smoke creation or unsightly stocking-out yards一句可知,水力发电的优点是无污染。因此选A。
单选题
In Mr. Manser's opinion, the main stumbling block to the development of hydro- electric power is the ______. A. capital outlay B. running costs C. public expenditure D. financial risk
【正确答案】
A
【答案解析】由The main trouble, appearing from his report, is financing an undertaking which has a heavy initial capital cost, and very low running costs一句可以看出,主要的困难在于高昂的启动资金,而不是很低的运行成本。因此答案选A。