根据《岩土工程勘察规范》(GB 50021--2001)第6.6.2条和《铁路特殊路基设计规范》(TB10035--2002)表7.1.15计算融沉系数
δ0=(h1-h2)/h1
=[(290.296-288.130)-(290.136-288.130))/(290.296-288.130)
=0.074
平均冻胀率
η=(h1-h2)/h2
=[(290.296-288.130)-(290.136-288.130)]/(290.136-288.130)
=0.080