单选题
Makete Integrated Rural Transport Project

    A. The disappointing results of many conventional road transport projects in Africa led some experts to rethink the strategy by which rural transport problems were to be tackled at the beginning of the 1980s. A request for help in improving the availability of transport within the remote Makete District of south-western Tanzania presented the opportunity to try a new approach.
    B. The concept of 'integrated rural transport' was adopted in the task of examining the transport needs of the rural households in the district. The objective was to reduce the time and effort needed to obtain access to essential goods and services through an improved rural transport system. The underlying assumption was that the time saved would be used instead for activities that would improve the social and economic development of the communities. The Makete Integrated Rural Transport Project (MIRTP) started in 1985 with financial support from the Swiss Development Corporation and was co-ordinated with the help of the Tanzanian government.
    C. When the project began, Makete District was virtually totally isolated during the rainy season. The regional road was in such bad shape that access to the main towns was impossible for about three months of the year. Road traffic was extremely rare within the district, and alternative means of transport were restricted to donkeys in the north of the district. People relied primarily on the paths, which were slippery and dangerous during the rains.
    D. Before solutions could be proposed, the problems had to be understood. Little was known about the transport demands of the rural households, so Phase I, between December 1985 and December 1987, focused on research. The socio-economic survey of more than 400 households in the district indicated that a household in Makete spent, on average, seven hours a day on transporting themselves and their goods, a figure which seemed extreme but which has also been obtained in surveys in other rural areas in Africa. Interesting facts regarding transport were found: 95% was on foot; 80% was within the locality; and 70% was related to the collection of water and firewood and travelling to grinding mills.
    E. Having determined the main transport needs, possible solutions were identified which might reduce the time and burden. During Phase Ⅱ, from January to February 1991, a number of approaches were implemented in an effort to improve mobility and access to transport.
    F. An improvement of the road network was considered necessary to ensure the import and export of goods to the district. These improvements were carried out using methods that were heavily dependent on labour. In addition to the improvement of roads, these methods provided training in the operation of a mechanical workshop and bus and truck services. However, the difference from the conventional approach was that this time consideration was given to local transport needs outside the road network.
    G. Most goods were transported along the paths that provide short-cuts up and down the hillsides, but the paths were a real safety risk and made the journey on foot even more arduous. It made sense to improve the paths by building steps, handrails and footbridges.
    H. It was uncommon to find means of transport that were more efficient than walking but less technologically advanced than motor vehicles. The use of bicycles was constrained by their high cost and the lack of available spare parts. Oxen were not used at all but donkeys were used by a few households in the northern part of the district. MIRTP focused on what would be most appropriate for the inhabitants of Makete in terms of what was available, how much they could afford and what they were willing to accept. After careful consideration, the project chose the promotion of donkeys—a donkey costs less than a bicycle—and the introduction of a locally manufacturable wheelbarrow.
    I. At the end of Phase Ⅱ, it was clear that the selected approaches to Makete's transport problems had had different degrees of success. Phase Ⅲ, from March 1991 to March 1993, focused on the refinement and institutional isation of these activities.
    J. The road improvements and accompanying maintenance system had helped make the district centre accessible throughout the year. Essential goods from outside the district had become more readily available at the market, and prices did not fluctuate as much as they had done before.
    K. Paths and secondary roads were improved only at the request of communities who were willing to participate in construction and maintenance. However, the improved paths impressed the inhabitants, and requests for assistance greatly increased soon after only a few improvements had been completed.
    L. The efforts to improve the efficiency of the existing transport services were not very successful because most of the motorised vehicles in the district broke down and there were no resources to repair them. Even the introduction of low-cost means of transport was difficult because of the general poverty of the district. The locally manufactured wheelbarrows were still too expensive for all but a few of the households. Modifications to the original design by local carpenters cut production time and costs. Other local carpenters have been trained in the new design so that they can respond to requests. Nevertheless, a locally produced wooden wheelbarrow which costs around 5000 Tanzanian shillings (less than $20) in Makete, and is about one quarter the cost of a metal wheelbarrow, is still too expensive for most people.
    M. Donkeys, which were imported to the district, have become more common and contribute, in particular, to the transportation of crops and goods to market. Those who have bought donkeys are mainly from richer households but, with an increased supply through local breeding, donkeys should become more affordable. Meanwhile, local initiatives are promoting the renting out of the existing donkeys.
    N. It should be noted, however, that a donkey, which at 20,000 Tanzanian shillings costs less than a bicycle, is still an investment equal to an average household's income over half a year. This clearly illustrates the need for supplementary measures if one wants to assist the rural poor.
    O. It would have been easy to criticise the MIRTP for using in the early phases a 'top-down' approach, in which decisions were made by experts and officials before being handed down to communities, but it was necessary to start the process from the level of the governmental authorities of the district. It would have been difficult to respond to the requests of villagers and other rural inhabitants without the support and understanding of district authorities.
问答题     If the project had been planned and completed with the combination of government, authorities and communities, it would have been more likely to achieve Success.
 
【正确答案】O
【答案解析】题干用虚拟语气表达,如果这个项目由政府、专家和社区共同计划和完成,它更有可能取得成功。原文O段大意,由于项目没有传达给当地社区,专家和政府官员就做出了决定,因此要批评这一项目很简单;但同时如果没有当地政府的支持,居民的需求也很难得到满足。所以,题干即原文的同义转述。所以,正确答案是O。
问答题     Due to the unsuccessful results of a number of transport programs, African authorities reconsider to deal with the problems in remote areas.
 
【正确答案】A
【答案解析】题干意为:因为大量交通项目不成功,非洲当局重新考虑来解决偏远地区的交通问题。原文A段第一句为The disappointing results of many conventional road transport projects in Africa led some experts to rethink the strategy by which rural transport problems were to be tackled at the beginning of the 1980s. 可知,题干是原句的改写,故选A。
问答题     Frequent breakdown of buses and trucks hindered attempts to make the existing transport services more efficient.
 
【正确答案】L
【答案解析】题干意为:公交和货车常出现故障有碍于提高现有交通服务的效率。原文L段第一句为The efforts to improve the efficiency of the existing transport services were not very successful because most of the motorized vehicles in the district broke down and there were no resources to repair them. 说明因为大多数机动车辆发出故障且没有条件修理,所以提高现有交通服务效率的努力不是很成功。因此,选择L。
问答题     It was to improve efficiency in attaining needed goods and services that was the purpose of newly raised concept.
 
【正确答案】B
【答案解析】题干意为:提高效率以获得所需的物资和服务是新提出理念的目标。原文B段第二句为The objective was to reduce the time and effort needed to obtain access to essential goods and services. 意思是“目标是减少获取基本物资和服务所费的时间和精力。”题干improve efficiency是原文reduce the time and effort的同义转述。故选B。
问答题     Construction of footbridges, steps and handrails improved paths used for transport up and down hillsides.
 
【正确答案】G
【答案解析】根据关键词footbridges和handrails定位于G段最后一句It made sense to improve the paths by building steps, handrails and footbridges. 通过修建台阶、扶手和人行桥来改善路况是有意义的。因此,答案选G。
问答题     Prior to the start of M1RTP the Makete district was almost inaccessible during the rainy season.
 
【正确答案】C
【答案解析】题干意为:在项目开始前,Makete地区在雨季几乎无法通行。原文C段第一句为When the project began, Makete District was virtually totally isolated during the rainy season,题干almost inaccessible与virtually totally isolated是近义替换,所以选C。
问答题     The isolation of Makete for part of the year was no longer a problem once the roads had been improved.
 
【正确答案】J
【答案解析】题干意为:一旦路况改善,Makete地区部分时候无法通行便不再是问题。原文J段第一句为The road improvements and accompanying maintenance system had helped make the district centre accessible throughout the year. 意思是“路况改善和配套保护制度使人们全年都可以到这个地区中心。”可看出,题干是此句的同义转述,故选J。
问答题     The survey concluded that one-fifth or 20% of the household transport requirement is outside the local area.
 
【正确答案】D
【答案解析】题干意为:调查统计出,五分之一的家庭出行目的地是在本地区以外。根据数字关键词20%定位于D段,80% was within the locality意思是“80%在本地区内”。所以,题干是此句的同义表达。因此,正确答案是D。
问答题     Donkeys other than oxen were regarded as a tool means for those people living in northern part of the district.
 
【正确答案】H
【答案解析】题干意为:住在北部地区的人们将驴当作一项交通工具,而不是牛。原文H段第三句为Oxen were not used at all but donkeys were used by a few households in the northern part of the district. 题干other than(而不是)对应not at all,故选H。
问答题     The improvement of secondary roads and paths was done merely at the request of local people who were willing to lend a hand.
 
【正确答案】K
【答案解析】题干意为:只有愿意帮忙的当地人民要求时,二级公路和道路才会得到改善。原文K段第一句为Paths and secondary roads were improved only at the request of communities who were willing to participate in construction and maintenance.题干lend a hand是原文willing to participate in construction and maintenance的近义转述。所以,正确答案是K。