单选题 不为处理某风险而修改项目计划的风险应对策略称为______。
单选题Which of the following is not a tool & technique of the develop project charter process?
单选题10 members were assigned in advance to your project team. This pre-assignment could because of all the following reasons EXCEPT:
单选题Your project has a number of different work results.You are collecting information about these work results,such as what costs have been incurred or committed and which deliverables have been completed and which remain outstanding.You will use this information in which of the following processes?
单选题下面哪个组织结构适合存在于多项目的大型公司里?
单选题在对项目进行管理过程中,你注意到合同一般条款内规定的一项可交付成果还没有收到。但是,卖方说明合同特别条款已经取消了该可交付成果。你应该如何做?
单选题A precision description of a deliverable is called a ______ .A) SpecificationB) BaselineC) Work packageD) Work breakdown structure element
单选题The purpose of the Taguchi method is to ______.
A. manage the flow of material for better visibility and control
B. use statistical techniques to compute a "loss function" to determine the
cost of producing products that fall to achieve a target value
C. design, group and manage production operations as self-contained flexible
cells capable of start-to-finish processing of a family of items
D. regulate coordination and communication among process stages
单选题The process of performance reporting includes all of the following except______.
单选题你公司的副总裁找到你,为他的新项目寻求帮助。他希望避免你们公司出现财务上的风险,而对新项目,完整的范围定义已经被董事会认可了。你建议他最好采用的合同类型是______。
单选题实施采购过程包括下列所有工作,除了______。
单选题某个房地产开发项目,进展情况不好。前任项目经理已经辞职。开发商委派你接手管理这个项目。在你上任之后,你计划立即召集项目团队开会。为了使会议取得预期的效果,你将主要使用哪种权力?( ) A.正式权力 B.专家权力 C.参照性权力 D.奖励权力
单选题为预料到项目潜在的质量问题并帮助制定解决这些问题的方法,你需要使用各种根源分析技术,其中不包括______。
单选题你是某个跨专业项目的项目经理,在矩阵型组织下工作。职能部门给你派来了一个员工。经过考察,该员工不具备项目所要求的某个技能,需要培训。谁负责确保他得到适当培训?( )A.高级管理层B.职能经理C.项目经理D.项目管理办公室主任
单选题管理层批准了一个为期2年的项目,6个月之后,项目延误并严重超支。经过分析之后,项目经理发现可以用赶工的方法使项目在工期目标内完成,但这会导致成本进一步超支。项目经理应该怎么做?______
A.立即开始赶工,以便赢得一些时间
B.基于累计CPI计算ETC,了解为保证按期完成,未来还要花多少钱
C.坚持要在原定的工期和成本目标内完成项目
D.综合考虑累计CPI和SPI,计算EAC,申请用EAC取代BAC
单选题Your schedule analysis has shown that your project has a high likelihood of experiencing a schedule overrun. You know this because the cumulative EV is much ______ . A) higher than the cumulative AC B) higher than the cumulative PV C) lower than the cumulative PV D) lower than the cumulative CPI
单选题The project team has added some additional functionality which was not required as part of the project. However the customer is satisfied with the project. From a quality perspective, ______ .A) this is high quality because it exceeded customer expectationsB) this is not acceptable quality because gold plating was done which is not advisableC) this will mean repeat business from the same customerD) none of the above
单选题 次生风险是______。
单选题承包商满足了合同规定,并完成了全部工作,但是结果却是你不能接受的。这个合同被认为是______。
单选题以下哪个说法是正确的?______