单选题某项目经理所在的公司从事高科技产品的信息集成工作。该项目经理现要为一个要求使用并集成一些不同的产品规格的新项目确定合适的组织结构,他最可能选择的类型是 (26) 。
单选题合同生效后,当事人就质量、价款或者报酬、履行地点等内容没有约定或者约定不明确的,可以以协议补充;不能达成补充协议的,按照 (58) 或者交易习惯确定。
单选题在进度管理中常用的活动网络图,如计划评审技术(PERT),关键路径法等,也可以应用于质量管理的( )过程中。
单选题我国颁布的《大楼通信综合布线系统YD/T926》标准的适用范围是跨度距离不超______米,办公总面积不超过100万平方米的布线区域。 A.500 B.1000 C.2000 D.3000
单选题下列做法无助于缩短活动工期的是______。
单选题PDM includes four types of dependencies or precedence relationships… (73) ,the initiation of the successor activity,depends upon the initiation of the predecessor activity.
单选题在某电力系统集成项目中,一名关键团队成员已经出现进度延误的迹象并且工作质量也开始出问题。项目经理相信该成员非常清楚工作的最终期限和质量规范要求。项目经理应采取的措施是______。
单选题以下关于数据仓库的叙述中,正确的是( )
单选题Why is (71) fun. What delights may its practitioner expect as his reward. First is the sheer joy of making things. As the child delights in his mud pie, so the adult enjoys building things, especially things of his own design. Second is the pleasure of making things that are useful to other people. Third is the fascination of fashioning complex puzzle-like objects of interlocking moving parts and watching them work in subtle cycles, playing out the consequences of principles built in from the beginning. Fourth is the joy of always learning, which springs from the (72) nature of the task. In one way or another the problem is ever new. and its solver learns something: sometimes (73) , sometimes theoretical, and sometimes both. Finally, there is the delight of working in such attractable medium. The (74) , like the poet, works only slightly removed from purethought-stuff. Few media of creation are so flexible, so easy to polish and rework, so readily capable of realizing grand conceptual structures. Yet the program (75) , unlike the poet's words, is real in the sense that it moves and works, producing visible outputs separate from the construct itself. It prints results, draws pictures, produces sounds, moves arms. Programming then is fun because it gratifies creative longings built deep within US and delights sensibilities we have in common with all men.
单选题关于商业智能及其技术的描述,正确的是( )
单选题为了保证信息系统工程项目投资、质量、进度及效果各方面处于良好的可控状态,我国在信息系统项目管理探索过程中逐步形成了自己的信息系统服务管理体系,目前该体系中不包 括______。
单选题以下关于项目整体变更控制过程的叙述中,不正确的是:( )。
单选题下列______最易产生冲突。
单选题应用已有软件的各种资产构造新的软件,以缩减软件开发和维护的费用,称为( )。
单选题以下关于软件需求分析、设计、测试与维护的叙述中,不正确的是:____。
单选题一个具有五个分包商的项目,分包商递交了变更请求,希望扩大其工作范围。根据对此请求的评审,决定对合同进行修订,该活动属于______。
单选题有效的项目整体通常需要强调______。 A.项目团队成员个人能力 B.及时更新项目计划 C.对主要交接点进行有效沟通 D.高层管理控制
单选题在项目进度控制中,( )不适合用于缩短活动工期。
单选题“自制/外购”分析是______的一部分。 A.询价 B.采购计划编制 C.竞争性投标 D.合同管理
单选题基于用户名和口令的用户入网访问控制可分为______三个步骤。