单选题需求变更提出来之后,接下来应该进行的是 (58) 。
单选题通常,项目开工会议的第一个主题应该是确定 (28) 。
单选题项目经理向客户推荐了4种供应商选择方案。每个方案损益值已标在如图9。3所示的决策树上。根据预期收益值,应选择设备供应商______。
单选题为了实现项目质量控制,经常用到各种图形工具,下面是______。
单选题( )是客户等项目干系人正式验收接受已完成的项目可交付物的过程。
单选题自制或外购的决定需要考虑 (60) 。
单选题以下关于工作分解结构(WBS)的叙述中,不正确的是( )。
单选题当与客户签署合同之后,许多供应商会进行内部立项。内部立项的主要作用不包括:( )。
单选题用匿名的方式在专家团队中征求意见并综合,从而对将来的可能风险做出预测的风险识别工具是________。
单选题以下关于项目成本预算的描述,错误的是______。
单选题在当今的高科技环境中,要成功的激励一个团队,项目经理要使用______激励理论才能保持一个快乐高效的团队。
单选题对承建方来说,固定单价合同适用于______的项目。 A.工期长,工程量变化幅度很大 B.工期长,工程量变化幅度不太大 C.工期短,工程量变化幅度不太大D.工期短,工程量变化幅度很大
单选题( )的项目不适合使用总价合同
单选题为保证合同订立的合法性,关于合同签订,以下说法不正确的是______。
单选题以下______估算技术可以使用原型法。 A.参数 B.外推 C.类比 D.历史结果
单选题整合者是项目经理承担的重要角色之一
单选题Why is ______ fun. What delights may its practitioner expect as his reward. First is the sheer joy of making things. As the child delights in his mud pie, so the adult enjoys building things, especially things of his own design. Second is the pleasure of making things that are useful to other people. Third is the fascination of fashioning complex puzzle-like objects of interlocking moving parts and watching them work in subtle cycles, playing out the consequences of principles built in from the beginning. Fourth is the joy of always learning, which springs from the ______ nature of the task. In one way or another the problem is ever new, and its solver learns something: sometimes ______, sometimes theoretical, and sometimes both. Finally, there is the delight of working in such attractable medium. The ______, like the poet, works only slightly removed from pure thought-stuff. Few media of creation are so flexible, so easy to polish and rework, so readily capable of realizing grand conceptual structures. Yet the program ______, unlike the poet's words, is real in the sense that it moves and works, producing visible outputs separate from the construct itself.It prints results, draws pictures, produces sounds, moves arms.Programming then is fun because it gratifies creative longings built deep within us and delights sensibilities we have in common with all men.
单选题确认项目范围是验收项目可交付成果的过程,其中使用的方法是( )
单选题以下关于表3-2的描述中,错误的是 (53) 。 表3-2 某人国资源管理表 活动 人员 小张 小王 小李 小赵 小钱 定义 R I I A I 测试 A C I I C 开发 R C I I C 注:R:对任务负责任;A:负责执行任务;I:拥有既定特权、应及时得到通知;C:提供信息辅助执行任务
单选题以下关于面向对象方法的描述中,错误的是 (14) 。