在任务分解中已列出每个工作单元与其他工作单元的关系,据此可梳理出各工作单元之间的依赖关系。依赖关系反映了任务顺序。依赖关系可分为( )。Ⅰ.强制依赖关系Ⅱ.可斟酌处理的依赖关系Ⅲ.外部依赖关系Ⅳ.内部依赖关系
(41)不是项目成本预算的直接依据。
下列选项中,不属于配置审核作用的是(331)。
在集成项目实施中,建设方要求建立项目配置管理。关于配置管理,以下叙述正确的是(321)。
IPv6 is short for "Internet Protocol Version 6". IPv6 is the "next generation" protocol designed by the IETF to(71) the current version Internet Protocol, IP version 4("IPv4"). Most of today's internet uses IPv4, which is now more than twenty years old. IPv4 has been(72) resilient in spite of its age, but it is beginning to have problems. Most importantly, there is a growing(73) of IPv4 addresses, which are needed by all new machines added to the Internet. IPv6 fixes a number of problems in IPv4, such as the(74) number of available IPv4 addresses. It also adds many improvements to IPv4 in areas such as routing and network autoconfiguration. IPv6 is expected to gradually replace IPv4, with the two coexisting for a number of years during a transition(75) .
建设方在进行项目评估的时候,根据项目的类型不同,所采用的评估方法也不同。如果使用总量评估法,其缺点是( )。
针对情况( ),能够依据《大楼通信布线系统》D/T926进行综合布线。
某系统集成项目的目标是使人们能在各地书报零售店购买到彩票,A公司负责开发该项目适用的软件,但需要向其他公司购买硬件设备。A公司外包管理员首先应准备的文件被称为(313)。
现有多个项目需要同一资源,否则便不能实施。为使延误的项目数最少,应该将该资源优先分配给( )。
在层次化网络设计方案中,通常在(17)实现网络的访问策略控制。
在距离矢量路由协议中,防止路由循环的技术是(203)。
(30)指对主体访问和使用客体的情况进行记录和审查,以保证安全规则被正确执行,并帮助分析安全事故产生的原因。
根据《中华人民共和国合同法》,隐蔽工程在隐蔽以前,承包人应当通知(35)来检查。若其没有及时来检查,承包人可以顺延工程日期,并有权要求赔偿停工等造成的损失。
x.509数字证书格式中包含的元素有:①证书版本;②证书序列号;③签名算法标识;④证书有效期;⑤证书发行商名称;⑥证书主体名;⑦主体公钥信息;⑧( )。
根据《中华人民共和国政府采购法》的规定,当______时不采用竞争性谈判方式采购。A.技术复杂或性质特殊,不能确定详细规格或具体要求B.采用招标所需时间不能满足用户紧急需要C.发生了不可预见的紧急情况不能从其他供应商处采购D.不能事先计算出价格总额
根据《计算机软件文档编制规范GB/T8567.2006》,在需求阶段内,作为本阶段的工作成果,应该编制出需求规格说明书、初步用户手册和(50)。
小张因电脑无法启动,向服务台提出服务请求。按照IT服务管理流程,服务台应向(28)提出服务指令。
在软件配置管理中,版本控制的目的是按照一定的规则保存配置项的( )。
在某企业承建的一个信息系统集成项目中,建设方注重交付时间和质量,承建方公司老总注重项目利润,质量监控部经理注重项目的质量,人力资源部经理注重项目人力使用效率。下列围绕项目干系人管理的叙述错误的是( )。
划分虚拟局域网(VLAN)有多种方式,以下划分方式中,不正确的是(2)。
