单选题挣值技术利用项目管理计划中的成本基准来评估项目绩效和与发生的相关偏差的量级。图7-7所示的某项目挣值管理图中标号所标示的区间依次应填写______。根据项目当前状态,项目经理下一步最可能采取的行动是______。
单选题项目经理向客户推荐了四种供应商选择方案。每个方案损益值已标在下面的决策树上。根据预期收益值,应选择设备供应商(53)。
单选题
单选题The earned value technique is a commonly used method of performance measurement. It integrates project scope, schedule, and cost measures to help the project management team assess project performance. If a project's Cost Performance Index (CPI=EV/AC) value less than 1.0, it means that ______.
单选题The intention of the ______ is to schedule,organize and control all activities to achieve the project goal eventually. No matter how difficult it is and what kind of risks are there.
单选题The ( ) process differs from the ( ) process in that the former is primarily concerned with acceptance of the deliverables, while the latter is primarily concerned with correctness of the deliverables
单选题
单选题UML状态图展示了一个特定对象的所有可能状态,以及由于各种事件的发生而引起的状态间的转移。在下列图中,______是一个UML状态图。A.B.C.D.
单选题● 在下列应用场景中,属于SaaS(软件即服务)模式的是__(6)__。
单选题( )are those costs that cannot be directly traced to a specific project and therefore will be accumulated and allocated equitably over multiple projects by some approved and documented accounting procedure
单选题UML的( )描述了一个特定对象的所有可能状态以及由于各种事件的发生而引起的状态之间的转移
单选题关于软件工程的描述,不正确的是( )
单选题在项目配置项与基线的变更控制中,( )是配置管理员的主要工作
单选题某项目年生产某种产品250万件,每件销售价为8元,可变单位成本5元,固定成本210万元,则该项目的盈亏平衡点销售额为 (66) 。
单选题在Web Service中,通过______来执行服务调用。 A.WSDL B.SOAP C.HTTPS D.UDDI
单选题程序员小柳在某项目中编写了源代码文件X的0.1版(以下简称Xv0.1)。随后的开发中小柳又修改了Xv0.1,得到文件X的1.0版(以下简称Xv1.0)。经过正式评审后,Xv1.0被纳入基线进行配置管理。下列后续活动中符合配置管理要求的是______。 A.经过变更申请、变更评估并决定实施变更后,变更实施人完成了变更,随后立即发布了变更,在第一时间内将变更内容和结果通知所有相关人员 B.程序员小柳被赋予相应的权限,可以直接读取受控库中的文件Xv1.0 C.文件Xv1.0进入基线后,配置管理员小李从配置库中删除了文件Xv0.1 D.小柳直接对Xv1.0进行了变更,之后通知了项目经理
单选题关于常用质量术语的理解中,不正确的是(42)。
单选题对于信息量很大或受众很多的情况,建议采用( )沟通方式
单选题中间件可以分为数据库访问中间件,远程过程调用中间件、面向消息中间件实务中间件,分布式对象中间件等多种类型、windows平台的ODBC和JAVA平台的JDBC属于()
单选题信息安全从社会层面来看,反映在( )这三个方面。