信息系统经济效益评价的方法主要有成本效益分析法、(50)和价值工程方法。(2009年11月试题50)
信息系统运行管理工具不包括(46)。(2007年5月试题46)
Project schedule management is made up of six management processes including:activity definition,activity sequencing,(71),and schedule control by order. Many useful tools and techniques are used in developing schedule.(72)is a schedule network analysis technique that modifies the project schedule to account for limited resource. Changes may be requested by any stakeholder involved with the proj ect,but changes can be authorized only by(73). Configuration management system can be used in defining approval level s for authorizing changes and providing a method to validate approved changes.(74)is not a project configuration management tool. Creating WBS means subdividing the major project deliverable into smaller components until the deliverable are defined to the(75)level.
在计算机系统中,(3)是指在CPU执行程序的过程中,由于发生了某个事件,需要CPU暂时中止正在执行的程序,转去处理该事件,之后又回到被中止的程序。
数据库的设计过程可以分为4个阶段,在(27)阶段,完成为数据模型选择合适的存储结构和存取方法。(2011年5月试题27)
以下叙述中,正确的是(16)。(2011年5月试题16)
开发人员将系统设计阶段得到的目标系统的逻辑模型转换为目标系统的物理模型,该阶段得到的工作总成果是(40),可作为下一个阶段系统实施的工作依据。
在某企业信息系统运行与维护过程中,需要临时对信息系统的数据库中的某个数据表的全部数据进行临时的备份或者导出数据,此时应该采取(57)的备份策略。(2007年5月试题57)
将长度为n的单链表链接在长度为m的单链表之后的算法的时间复杂度为(2)。
配置管理作为一个控制中心,其主要目标表现在计量所有IT资产、(56)、作为故障管理等的基础以及验证基础架构记录的正确性并纠正发现的错误等4个方面。(2009年11月试题56)
以下关于串行传输和并行传输的叙述中,正确的是(5)。
实施信息系统新增业务功能的扩充工作是(40)的职责。(2007年5月试题40)
在结构化分析活动中,通常使用(23)描述数据处理过程。(2011年5月试题23)
在结构化程序设计中,(34)的做法会导致不利的程序结构。(2008年5月试题34)
以下媒体中,(27)是感觉媒体。
系统开发过程中的第一个正式文档是(45)。
在线收费音乐网站A拥有B音乐作品的版权,并在该网站上提供B音乐作品mp3文件的付费下载服务。搜索引擎C可以免费下载B音乐的mp3文件。以下说法中较妥当的是(2)。
是一种数据访问机制,它允许用户访问单独的数据行,而非对整个行集进行操作(通过使用SELECT、UPDATE或者DEL ETE语句进行)。
统一建模语言(UML)是面向对象开发方法的标准化建模语言。采用UML对系统建模时,用(32)描述系统的全部功能,等价于传统的系统功能说明。(2008年5月试题32)
从下面一条RIP路由信息中我们可以得到的结论是(36)。
