7BALCI C. Correlation of rock cutting tests with field performance of a TBM in a highly fractured rock formation: A case study in Kozyatagi-Kadikoy metro tunnel[J]. Tunneling and Underground Space Technology, 2009 (1): 1-13.
8DAHL F, EIBIND G, TORKJELL B. Development of a new direct test method for estimating cutter life based on the Sievers' J miniature drill test[J]. Tunneling and Underground Space Technology, 2007, (22): 106-116.
9REILLYB J. EPB for the north east line project[J]. Tunneling and Underground Space Technology, 1999, 14(4): 491-508.
10GERTSCH R, GERTSCH L, ROSTAMI J. Disc cutting tests in colorado red granite: Implications for TBM performance prediction[J]. International Journal of Rock Mechanics & Mining Sciences, 2007, 44(2): 238-246.