摘要
水库维修改造工程是彭阳县狠抓的重点建设项目,关系到国计民生,做好水库维修改造工程施工设计是当前水库维修建设的关键。文章以上温沟水库的工程建设为研究背景,经现场勘测及安全鉴定评价发现,水库存在淤积严重、坝体碾压不均匀、水库总体无法满足彭阳县已实施的茹河流域库坝连通工程总体规划要求等问题,并基于此重点探讨了具体的维修改造设计方案,以供参考。
Reservoir maintenance and reconstruction project is a key construction project in Pengyang County,which is related to the national economy and people’s livelihood.A good construction design is the key to the current reservoir maintenance and construction.In this paper,the construction of the Shangwengou Reservoir is taken as the research background.Through field investigation and safety evaluation,it is found that the reservoir has serious siltation,uneven dam compaction,and the reservoir cannot meet the overall planning requirements of the reservoir dam connection project in the Ruhe River Basin implemented in Pengyang County.Based on this,the specific maintenance and reconstruction design scheme is discussed for reference.
作者
冯乐
Feng Le(Pingliang Jingdong Water Conservancy and Hydropower Survey and Design Co.,Ltd.,Pingliang,Gansu 744000)
出处
《工程技术研究》
2022年第9期176-178,共3页
Engineering and Technological Research
关键词
上温沟水库
维修改造
设计方案
Shangwengou Reservoir
maintenance and reconstruction
design scheme