大跨度钢箱梁步履式顶推施工安全研究 被引量:4

Research on Construction Safety of Walking Incremental Launching for Large-span Steel Box Girder
下载PDF
导出
摘要 在钢箱梁施工方案比选中,受现场起重设备等因素影响,顶推施工越来越受工程师青睐。为保证施工安全,减少辅助墩数量,一般需要设置较长的导梁进行辅助施工,因此对导梁和主梁进行安全分析变得尤为重要。以某(50+85+50)m钢箱梁为工程实例,利用Midas Civil对其施工关键工况进行模拟分析,计算结果表明:顶推施工过程中,结构强度、刚度及稳定性满足要求。 In the comparison of construction schemes of the steel box girder,affected by factors such as on-site lifting equipment,the incremental launching construction is becoming more and more popular with engineers.To ensure construction safety and reduce the number of auxiliary piers,setting a longer launching nose is necessary to assist in the construction,so,it is vital to analyze the safety of the launching nose and main beam.In this paper,taking a steel box girder of(50+85+50)m as an engineering practice,the key working conditions are simulated by Midas Civil.The calculation results show that during the incremental launching construction,the structural strength,stiffness,and stability meet the requirements.
作者 王洪梽 张全帅 王其林 刘波 WANG Hong-zhi;ZHANG Quan-shuai;WANG Qi-lin;LIU Bo(Yantai University,Yantai,Shandong 264003,China;Jiangsu Expressway Engineering Maintenance Co.,Ltd.,Huaian,Jiangsu 223001,China)
出处 《山西交通科技》 2023年第2期72-75,共4页 Shanxi Science & Technology of Transportation
关键词 钢箱梁 步履式顶推施工 导梁 有限元模拟 受力分析 steel box girder walking incremental launching construction launching nose finite element simulation stress analysis
  • 相关文献

参考文献5

二级参考文献20

共引文献124

同被引文献15

引证文献4

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部