摘要
本文结合具体工程实例,分析出现现浇楼板负筋施工一次验收合格率的问题,通过调查归纳分析,查找了主要原因,并针对性的采取了相应的工艺工序,有效解决了楼板负筋保护层不足的问题。
This paper analyzed the problem of the acceptance rate of cast-in-place floor negative reinforcement construction,found out the main reasons through investigation and analysis,and adopted the corresponding technological process,which effectively solves the problem of insufficient protective layer of floor negative reinforcement.
作者
李阳彬
李秀芳
Li Yangbin;Li Xiufang(Xinjang Yilong Zhongda Construction Engineering Co.,Ltd.,Urumqi 830010;Xinjiang Changji Quality and Safety Service Center of Construction Engineering,Changji 831199)
出处
《商品混凝土》
2020年第8期65-67,共3页
Ready-Mixed Concrete
关键词
楼板
负筋
施工质量
措施