井筒地下潜水溢流倒灌水患治理技术

Treatment technology of water hazard of groundwater backward overflow in shaft
下载PDF
导出
摘要 为解决山东新河矿业公司雨季地下潜水位上涨通过主井原提风道、副井管子道溢流倒灌井下,影响主、副井提升安全的问题,在不影响井筒正常提升的前提下,采用了导管引流、构建砖混模板墙进行防渗、充砂、灌注浆的方法,治理地下潜水水患,保证矿井安全平稳运行。实践证明,该方法切断了地下浅层孔隙水倒流通道,有效地解决了地下潜水位上涨溢流倒灌问题。该方法治理效果明显,工期短,费用低,在类似井筒水害治理工程施工中具有一定的借鉴价值。 In order to solve the problem that the groundwater level rises through the main shaft and the auxiliary shaft in rainy season in Shandong Xinhe coal mine,which affects the safety of the main and auxiliary shafts.To control the groundwater and ensure the safe and stable operation of the mine,on the premise of not affecting the normal lifting of wellbore,the methods of conduit drainage,construction of brick-concrete formwork wall for seepage control,sand filling and grouting were adopted.Practice has proved that this method cuts off the shallow pore water backflow channel underground,and effectively solves the problem of overflow backward at the underground level.The method has obvious effects on water hazard control,short construction period,low cost and good benefit.It has certain reference and popularization application value for water hazard control engineering in the construction of similar shafts.
作者 贾传伟 徐新启 田茂虎 JIA Chuanwei;XU Xinqi;TIAN Maohu(Shandong Xinhe Mining Co.Ltd.,Jining 272400,China;Zibo Mining Group Co.Ltd.,Zibo 255100,China)
出处 《煤田地质与勘探》 CAS CSCD 北大核心 2019年第S01期52-55,共4页 Coal Geology & Exploration
关键词 潜水溢流 防渗 充砂 灌注浆 井筒倒灌水患 山东新河煤矿 Phreatic water overflow seepage filled with sand slurry infusion backward overflow in shafts Xinhe coal mine in Shandong
  • 相关文献

参考文献10

二级参考文献34

共引文献29

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部