地下室外剪力墙后浇带临时封闭施工技术 被引量:1

Temporary Closure Construction Technology of Post Cast Strip of Underground Outdoor Shear Wall
下载PDF
导出
摘要 在建筑工程中,高层建筑主楼与裙楼或主楼之间通过设置后浇带来解决建筑物之间所产生的不均匀沉降、钢筋混凝土的收缩变形问题。其中地下室侧墙后浇带的存在给后期防水施工、土方回填带来极大不便。因而衍生出多种后浇带临时封闭的施工技术,较为常见的做法是在后浇带侧墙外侧砌筑砖砌体来达到临时封闭的效果,少数项目也有采用混凝土预制板封闭的做法,昆明白麓城项目部在对原有的临时封闭施工技术上进行了相应的改进、完善后,采用钢板代替预制混凝土板实现了在主体结构施工期间进行地下室基坑周围土方回填,效果显著,施工方便,较传统做法防水效果及施工方便性有较大的提高。 In the construction engineering,the problem of uneven settlement and shrinkage deformation of reinforced concrete between the main building and the podium building or between the main building and the main building is solved by post pouring.Among them,the existence of the post cast strip of the basement side wall brings great inconvenience to the later waterproof construction and earthwork backfilling.Therefore,a variety of construction technologies of temporary closure of post cast strip have been derived.The more common method is to build brick masonry outside the side wall of post cast strip to achieve the effect of temporary closure.A few projects also adopt the method of concrete precast slab closure.After the corresponding improvement and improvement of the original temporary closure construction technology,the project Department of Kunming Bailucheng has adopted steel plate instead of precast concrete.The concrete slab realizes the earthwork backfilling around the basement foundation pit during the construction of the main structure.The effect is remarkable and the construction is convenient.
作者 赵兴辉 汤自坤 Zhao Xing-hui;Tang Zi-kun
出处 《建筑技术开发》 2020年第14期33-34,共2页 Building Technology Development
关键词 高层建筑 沉降后浇带 预封闭 high-rise building settlement post pouring belt pre sealing
  • 相关文献

参考文献5

二级参考文献6

共引文献14

同被引文献11

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部