摘要 基于核电厂厂区暴雨水淹模拟软件,以某沿海核电厂址厂区雨水管网工程为例,建立了厂区暴雨水淹模型,模拟分析了不同工况下厂区雨水管网的运行情况、厂区水淹位置、淹没区积水深度、淹没区积水水量,并对比分析了淤塞工况与非淤塞工况下雨水管网的运行状态及厂区积水状态,为排水管网设计方案论证、厂区水淹风险分析和排水管网运维管理提供指导。 Base on simulation software of storm water flooding in nuclear power plant,taking a coastal nuclear power plant as an example,a model of storm water flooding in nuclear power plant was built to simulate the operation situation of storm pipe,location of flooding,depth of flooding,and volume of flooding.In addition,the operation condition of rainwater pipe network and yard flooding condition under two conditions between piping silting condition and normal condition were compared,so as to demonstrate design of piping network,to analyze flooding risk in yard,and to provide maintenance guidance for operating personal in nuclear power plant.
作者 李大鹏 童浩 郭天翔 杨攀 王陆军 Li Dapeng;Tong Hao;Guo Tianxiang;Yang Pan;Wang Lujun(Shanghai Nuclear Engineering Research and Design Institute,Shanghai 200233,China;Luoyang Hi-Tec Hongye Technology Co.,Ltd.,Luoyang 417003,China)
出处 《给水排水》 CSCD 北大核心 2020年第S01期128-132,137,共6页 Water & Wastewater Engineering
基金 国家科技重大专项(2011ZX06002-001)
关键词 核电厂 水淹分析 管道淤塞 模拟软件 Nuclear power plant Flooding analysis Pipe silting Simulation software
  • 相关文献

参考文献3

二级参考文献23

共引文献56

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部