摘要
为了加强神东洗选中心机电管理,提升选煤厂机电管理水平,从机电基础管理、信息化管理、机电队伍建设及机电激励等4个方面,构建机电管理提升体系,实现机电全过程管控,提升机电管理效能,降低设备故障率,为企业高质量发展,构建世界一流示范专业化单位提供基础保障。
In order to strengthen the mechanical and electrical management Shendong Coal Preparation Center,and improve the mechanical and electrical management level of the coal preparation plant,the mechanical and electrical management improvement system was constructed from four aspects of mechanical and electrical basic management,information management,mechanical and electrical team construction and mechanical and electrical incentive,so as to realize the whole process management and control of mechanical and electrical,improve the efficiency of mechanical and electrical management,reduce the failure rate of equipment,and build a world-class demonstration specialization sheet for the high-quality development of the enterprise provides basic support.
作者
张新明
ZHANG Xinming(CNH Energy Shendong Coal Preparation Center,Yulin 719315,China)
出处
《洁净煤技术》
CAS
北大核心
2021年第S01期116-118,共3页
Clean Coal Technology
关键词
选煤厂
机电管理
提升策略
coal preparation plant
electromechanical management
promote strategy