摘要
以呼和浩特市三环路工程(A区域)施工二标段项目呼永高压线(220kV)下架设预制箱梁施工为研究背景,为了解决高压线下受限空间内传统架梁方式无法架梁的问题,在高压线下搭设纵、横移临时支架,在箱梁滑移的前进端安装连续千斤顶及反力座,千斤顶通过预应力钢绞线与后锚点连接,可以将箱梁向前拖拉滑移,在远离高压线的位置将箱梁吊装到纵移支架滑块上,千斤顶拖拉箱梁进行纵向滑移,到达横移支架位置后更换横移支架千斤顶拖拉箱梁进行横向滑移,滑移到位后采用三维千斤顶调整箱梁纵横向位置落位至支座上。并通过应用MIDAS Civil力学分析软件对滑移支架系统进行安全性验算,验算结果满足要求。通过研究和应用提出了一套高压线下受限空间箱梁架设施工工法,有效地解决了高压线下受限空间无法架设箱梁的难题,既确保了箱梁架设施工安全,又加快了施工进度,为今后类似工程提供借鉴与参考。
Taking the construction of precast box girder under the Huyong High Voltage Line(220kV)as the research background,the precast box girders are constructed by sliding construction method in the limited space under the high-voltage line,and the safety of the sliding support system is checked by using MIDAS Civil mechanical analysis software,a set of construction method for erecting box girder in confined space under high voltage line is put forward.The problem that box girder can not be erected in limited space under high voltage line is solved effectively.It not only ensures the safety of box girder erection,but also speeds up the construction schedule.
作者
刘磊
赵璐璐
王红光
韩明涛
申岩
李洪亮
赵展
LIU Lei;ZHAO Lulu;WANG Hongguang;HAN Mingtao;SHEN Yan;LI Hongliang;ZHAO Zhan(China Construction Seventh Bureau Fourth Construction Co.,Ltd.,Xi'an 710000,China)
出处
《建筑结构》
北大核心
2023年第S01期2287-2291,共5页
Building Structure
关键词
高压线
受限空间
预制箱梁架设
安全性分析
施工工法
high voltage line
confined space
precast box girder erection
safety analysis
construction method