期刊文献+

一种作业车间调度问题的Hopfield神经网络优化方法 被引量:2

An Optimization for Job-shop Scheduling Problem Based on Hopfield Neural Network
下载PDF
导出
摘要 结合Hopfield神经网络结构和作业车间调度问题(JSSP)的约束特点,给出了适合于Hopfield神经网络求解的作业车间调度问题的矩阵表达数学模型。借用神经网络中能量函数的概念和含义确定网络的连接权,并将模拟退火算法应用于Hopfield神经网络求解,避免了系统输出陷入局部极值。将优化作业车间调度方案问题转换成求解网络系统的平衡点,即吸引子,该网络不仅能输出可行最优解,且优化速度快、实时性强。并通过计算机仿真表明了该方法的有效性。 Combining the optimization function of Hopfield neural network and characteristics of jop-shop scheduling problem(JSSP),matrix expression mathematic model which fits to solve the JSSP with Hopfield neural network was put forward.The parameters of neural network circuit ascertained and the stability of the systems based on energy function concept of neural network was proved.The optimization about JSSP was turned into seeking attracting point or stable point of neural network system,so solving speed is very ...
出处 《机床与液压》 北大核心 2006年第11期4-6,9,共4页 Machine Tool & Hydraulics
基金 国家自然科学基金资助项目(60474022)
关键词 HOPFIELD神经网络 作业车间调度 能量函数 优化 Hopfield neural network Job-shop scheduling Energy function Optimization
  • 相关文献

参考文献5

  • 1[1]Zhou D N,et al.A neural network approach to job shop scheduling[J].IEEE Trans on Neural Networks,1991,2(1):175-179.
  • 2[2]Zhang Changshui,Yan Pingfan.A Genetic Algorithm of Solving Jop-Shop Scheduling Problem[J].Chinese Journal of Electronics,1995,4 (1):48-52.
  • 3[3]Abade A,Binder Z Ladet P.A neural network for solving jop shop scheduling problem[C].IFAC/IFIP Conference on Management and Control of Production and Logistic,1997:435-442.
  • 4吴怡,刘民,吴澄.JSSP基本约束特点分析及调度算法[J].清华大学学报(自然科学版),2004,44(10):1380-1383. 被引量:5
  • 5王秀利,吴惕华.一种求解多处理器作业调度的Hopfield神经网络方法[J].系统工程与电子技术,2002,24(8):13-16. 被引量:7

二级参考文献15

  • 1[1]Zhang C S , Yan P F, Chang T. Solving Job-Shop Scheduling Problem with Priority Using Neural Network[J]. IEEE Int. Conf. Neural Networks, 1991: 1361-1366.
  • 2[2]Chang C Y, Jeng M D. Experimental Study of a Neural Model for Scheduling Job Shops[J]. IEEE Int. Conf. System, Man, Cybernetics, 1995, 1: 536-540.
  • 3[3]Yang S X, Wang D W: Constraint Satisfaction Adaptive Neural Network and Heuristic Combined Approaches for Generalized Job-Shop Scheduling[J]. IEEE Trans. on Neural Network, 2000, 11: 474-486.
  • 4[4]Huang Y M, Chen R M. Scheduling Multiprocessor Job with Resource and Timing Constraints Using Neural Networks[J]. IEEE Trans. on Syst., Man, Cybernetic, 1999, 29, 490-502.
  • 5[5]Hopfield J J, Tank D W. Neural Computation of Decision in Optimization Problems[J]. Biol. Cybern., 1985, 52: 141-152.
  • 6CHEN Haoxun, CHU Chengbin, Proth J M. An improvement of Lagrangean relaxation approach for job shop scheduling: a dynamic programming method [J]. IEEE Trans on Robotics and Automation, 1998, 14(5) : 786 - 795.
  • 7Dimopoulos C, Zalzala A M S. Recent developments in evolutionary computation for manufacturing optimization:problems, solutions, and comparisons [J]. IEEE Trans Evolutionary Computation, 2000, 4(2): 93 - 113.
  • 8PanWalker S S, Iskander W. A survey of scheduling rules[J]. Operations Research, 1977, 25(1): 45 - 61.
  • 9Blazewicz J, Kobler J. Review of properties of different precedence graphs for scheduling problems [J]. European J of Operational Research, 2002, 142(3): 435- 443.
  • 10Dasgupta D, Attoh-Okine N. Immunity-based system: A survey [A]. Proc 1997 IEEE Int Conf on System, Man and Cybernetics [C]. Orlando, FL: IEEE, 1997.

共引文献10

同被引文献29

  • 1王耀南,余群明,袁小芳.混沌神经网络模型及其应用研究综述[J].控制与决策,2006,21(2):121-128. 被引量:12
  • 2严晨,王直杰.基于改进型能量函数和瞬态混沌神经网络的TSP问题研究[J].系统仿真学报,2006,18(5):1402-1405. 被引量:3
  • 3丁慧强,李之岱,东明.包装钢带并行生产线排产优化问题研究[J].冶金经济与管理,2006(4):22-24. 被引量:2
  • 4孙华丽,谢剑英.基于暂态混沌神经网络的多车调度混合优化算法[J].控制与决策,2007,22(1):105-108. 被引量:3
  • 5Derya Eren Akyol,G Mirac Bayhan.A review on evolution of production scheduling with neural networks[J].Computers & Industrial Engineering,2007,53 (4):95-122.
  • 6Foo S Y P,Takefuji Y.Stochastic neural networks for solving job-shop scheduling:Parts Ⅱ.Arehiteetrue and simulations[A].Proeeedinging of the IEEE International Conference on Neural Networks[C].San Diego:CA,1988:283-290.
  • 7Abada A,Binder Z,Ladet P.A neural network for solving job shop scheduling problem[C].IFAC,Conference on Management and Control of Production and Lngistics,1997:342-346.
  • 8Sun K T,Fu H C.A hybrid neural network model for solving optimization problems[J].IEEE Transactions on Computers,1993:218-227.
  • 9Willems T M,Brandts L E M W.Implementing heuristics as an optimization criterion in neural networks for jobshop scheduling[J].Journal of intelligent Manufacturing,1995:377-387.
  • 10Liu X D,Xiu C B.A novel hysteretic chaotic neural network and its applications[J].Neurocomputing,2007,70 (5):2561-2565.

引证文献2

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部