200m级RCC重力坝优选渗控设计方案研究 被引量:3

Study on reasonable seepage control scheme of 200m height RCC gravity dam
下载PDF
导出
摘要 寻求合适的渗控措施以解决坝的渗流问题是高碾压混凝土坝技术发展的关键。以光照水电站200米级RCC重力坝为依托,利用节点虚流量全域迭代法和改进的排水孔模拟技术,对该坝上游面拟采用变态混凝土与二级配碾压混凝上组合防渗结构方案防渗效果进行了分析;研究了坝体可能出现的裂缝和排水孔幕的渗控作用。研究表明:该防渗型式可行,优势明显,能满足200米级RCC重力坝渗控要求,综合分析后提出了优选方案。 It is key of development high RCC dam to find the seepage control measure to solve seepage.Based on the structural design of about 200m RCC gravity dam of Guangzhao Hydropower project,the effectiveness of the seepage control schemes of the combination of distorted concrete face slab on dam up stream side with two graded aggregate RCC was analyzed by using procedure of nodal virtual flux of global iteration and improved method of drainage hole in detail;Mean while,the seepage control effect of drainage curta...
出处 《水利学报》 EI CSCD 北大核心 2007年第S1期184-188,共5页 Journal of Hydraulic Engineering
基金 国家自然科学基金重点资助项目(50539020)
关键词 RCC重力坝 层缝面 渗控方案 变态混凝上 有限元 光照水电站 RCC gravity dam lift joint seepage control scheme distorted concrete FEM Guangzhao hydropower station
  • 相关文献

参考文献8

二级参考文献25

  • 1朱岳明,许红波.碾压砼坝的渗控分析研究[J].岩土工程学报,1993,15(6):34-43. 被引量:13
  • 2朱岳明,黄文雄.碾压混凝土及碾压混凝土坝的渗流特性研究[J].水利水电技术,1995,26(12):49-57. 被引量:22
  • 3朱岳明,陈振雷,吴愔,陈晴,徐爱忠.改进排水子结构法求解地下厂房洞室群区的复杂渗流场[J].水利学报,1996,28(9):79-85. 被引量:58
  • 4姜福田.碾压混凝土[M].北京:中国铁道出版社,1979.94-107.
  • 5盛骤 谢式千 等.概率论与数理统计,第2版[M].北京:高等教育出版社,1989.148-153.
  • 6余济贤 中国碾压混凝土坝情报网.江垭RCC大坝的监理实践与体会.碾压混凝土筑坝技术交流会论文集[M].北京:水利电力出版社,1998.62-66.
  • 7朱岳明.Some techniques for solution to free surface seepage flowthrough arch dam abutments [A].Proceddings of the Intern.Symposium on Arch Dams[C].Nanjing: Hohai University Press,1992.613-618.
  • 8[1]SL53-94,水工碾压混凝土施工规范[S].
  • 9[2]SL-25-92,水利水电工程钻孔压水试验规程[S].
  • 10朱岳明,水利学报,1996年,1期