750 kV示范工程系统调试综述

Summary of 750 kV Pilot Project System Commissioning Test
下载PDF
导出
摘要 国家电网公司750 kV示范工程系统调试范围为750 kV官亭变电站变电工程、750 kV兰州东变电站变电工程、750 ky审亭变电站至750 kV兰州东弯电立占一条140 km的759 kV线路.系统调试方案包括两部分:第一部分为750 kV输变电示范工程系统调试方案,第二部分为750 kV示范工程系统调试测试方案.本文详细叙述了系统调试方案中的试验项目和试验内容;并对系统调试测试项目进行了简单介绍.对系统调试结果进行了简单概括分析,并给出了系统调试结论. The 750 kV transmission pilot project system commissioning test in Northwest of China included GuanTing 750 kV transmission substation,LanZhouDong transmission substation and 750 kV transmission line of 140 km.The contents of 750 kV system commissioning test were divided into two parts.The first part was the 750 kV system commissioning test program,and the second part was the 750 kV system commissioning measurement scheme.The system commissioning test program including test items and test contents were introduced in this paper.The system commissioning measurement scheme was briefly introduced.The results of system commissioning test were briefly analyzed.The conclusions were given in the end.
出处 《电网与水力发电进展》 2007年第9期25-29,共5页
关键词 750kV示范工程 系统调试方案 系统调试测试方案 系统调试 750 kV transmission pilot project System commissioning test program System commissioning measurement scheme System commissioning test
  • 相关文献

参考文献11

二级参考文献88

共引文献427

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部