摘要
介绍了城市高架桥中连续钢箱梁的制作过程以及对其尺寸精度和焊接的质量控制。
It is introduced that the manufacturing processes of continuous steel box girder of project,as well as the quality control of its size precision and welding
出处
《工业建筑》
CSCD
北大核心
2005年第z1期338-341,共4页
Industrial Construction
关键词
钢箱梁
圆曲线
缓和曲线
质量控制
steel box girder round curve trasition curve quality control