摘要 目前台灣地區之工程為爭取時效及減少施工上之介面問題,已漸漸採用統包方式來進行發包作業,以使相關工程完工如期、造價如度、品質如式為目標。一般統包工程均由營造廠所承攬,而目前台灣營造廠又往往無足夠設計能力來进行相關設計工作,因此為配合相關設計作業,營造廠或施工單位往往均需與設計顧問公司配合,故如何在設計與施工上使設計顧問公司與營造廠或施工單位能充分配合,即是工程成功關鍵之因素。針對中部某山區之山岳隧道為統包方式,採用邊設計及邊施工之案例予以探討,以期可作為相關類似工程之參考。 In order to control construction period, budgets and quality and reduce interface problems, many projects have adopted the turnkey contact to distribute the construction work in Taiwan. In general, the responsibility of the project under the turnkey system falls on the construction companies. But the construction companies in Taiwan do not have sufficient design capabilities to perform the relevant tasks and thus they usually cooperate with design consultant firms. So the design consultant firms play important roles in coordinating with the construction parties. The case of turnkey system used in a tunnel in the mountainous region of central Taiwan is discussed.
出处 《岩石力学与工程学报》 EI CAS CSCD 北大核心 2004年第z2期5214-5218,共5页 Chinese Journal of Rock Mechanics and Engineering
关键词 隧道工程 山岳隧道 統包工程 邊設計及邊施工 tunneling engineering, mountain tunnel, turnkey contact, design and building
  • 相关文献

参考文献2

  • 1李得璋.公共工程實施統包制度之檢討與展望[J].土木水利,2002,29(3):99-101.
  • 2[2]張欽森,林仁壽,蕭俊志等.由觀塘工業區開發計畫工業港、造地工程及液化天然氣接收站之統包探討工程介面問題[R].台北:台灣科技大學,2002