摘要
介绍乌鞘岭隧道6号斜井工区的反坡排水的设计、施工、设备选型、管理及实施效果。
An introduction is given to design and construction of reverse slope drainage design for working area of inclined shaft No. 6 of Wushaoling Tunnel, and to selection of equipment,management, and implementation effect.
出处
《铁道建筑技术》
2004年第z1期39-42,共4页
Railway Construction Technology
关键词
铁路隧道
长隧道
反坡排水
施工
railway tunnel, reverse slope drainage, construction