期刊文献+

间歇式活性污泥法处理生活污水的试验研究 被引量:5

Experimental study on sanitary waste by sequencing batch reactor
下载PDF
导出
摘要 对间歇式活性污泥法对城市生活污水进行了试验研究。在试验中探讨了生物脱氮除磷的规律及对处理效果的影响。结果表明 :在总停留时间控制在 4 5~ 5 5h ,污泥负荷为 0 14~ 0 2 6kg BOD5/ (kgMLSS·d) ,进水BOD594 7~ 135 0mg/l,CODcr186~ 2 6 6 7mg/l,NH4-N15 .0~ 2 5 4mg/l,TP5 6~ 7 1mg/l条件下 ,达到了既去除有机物又能脱氮除磷的效果。出水BOD5浓度在 6 6 3~ 17 0 5mg/l,去除率达 85 %~ 93% ;出水CODcr浓度在 2 2 32~ 4 8 0mg/l,去除率达 82 %~ 88% ;出水NH4-N浓度在 2 83~ 9 83mg/l,去除率达 5 3%~ 87% ,出水TP浓度在 0 1~ 0 4 5mg/l,去除率达 85 %~ 99%。 The treatment of municipal wastewater by sequencing batch reactor and the regularity and effects of nitrogen and phosphorus removal from municipal wastewater was studied.The results showed that the removal rate of BoD 5,COD Cr ,NH 3-N and TP was respectively 85%~93%,82%~86%,53%~87%,85%~99%and the effluent concentration of BOD 5,COD Cr ,NH 3-N and TP was partly 5 12~13 62mg/l,10 7~32 2mg/l, 2 83~9 83mg/l and 0 1~0 45mg/l under the conditions of total HRT was 4 5~5 5 ,sludge load was 0 14~0 26kgBOD 5/(kgMLSS·d),the influent concentration of BOD 5,COD Cr ,NH 3-N and TP was partly 94 7~135 0mg/l,186~266 7mg/l,15 0~25 4mg/l,5 6~7 1mg/l.
出处 《哈尔滨商业大学学报(自然科学版)》 CAS 2002年第2期201-204,共4页 Journal of Harbin University of Commerce:Natural Sciences Edition
基金 建设部 2 0 0 0年度科技计划项目 (建科 [2 0 0 0 ] 2 85 )
关键词 间歇式活性污泥法 生活污水 脱氮除磷 污水处理 sequencing batch reactor sanitary waste nitrogen and phosphorus removal wastewater treament
  • 相关文献

参考文献1

二级参考文献2

  • 1王一尘编译.阳离子表面活性剂的合成[M].北京:轻工业出版社,1984..
  • 2[1]W. P. Iverrson. Microbes plays a considerable role in corrosion, proc, conf. Biol Corrosion, 1985; 10(32): 327.

同被引文献16

  • 1李军,赵红静,边喜龙,王宝贞.序批式生物膜法处理杂排水工艺探讨[J].城市环境与城市生态,1994,7(4):1-7. 被引量:6
  • 2Huang L P, Zhou J T, Yang F L, et al. Biodegradation of 1 - amino - 4 - bromoanthra - quinone - 2 - sulfonic acid by Zoogloea itzigohn HP3[A]. In: Hu X J, Po L Y(eds). Proceedings of the Third Asia- Pacific Conference on Sustainable Energy and Environmental Technology, 2000, 39 (8): 831-838.
  • 3中华人民共和国国家标准.建筑中水设计规范[S].GBJXX-2001.2001.
  • 4李伟英 范理初.浅议中水回用技术.给排水,2001,(11):48-49.
  • 5GONZALES S,WILDERER.P.A.Phosphate removal in a biofilm reactor[J].Water Science Technology.1990(23)7~9:1405~1416
  • 6IRVINE R L,WILDERER,FLEMMING H.Controlled unsteady state processes and technolgics-an overview[J].Wat.Sci.Tech.1997,35(1):1~10.
  • 7FALKENTOFT C.M,HARREMOES,MOSBEK H.The significance of zonation in a denitrifying,phosphorus removaing biofilm[J].Wat.Sci.Tech.1999,33(15):3303~3310.
  • 8GIUSEPPE P,ROBERTO C,LUCA PPhosphorus and nitrogen removal in moving-bed sequencing batch biofilm reactyors[J].Wat.Sci.Tech.1999,40(4):169~176.
  • 9SEIFERTH S,BEHRENDT J,SEKOULOV I.The biofilm filter sequencing batch reactor[J].Wat.Sci.Tech.1999,39(8):77~83.
  • 10Fang H.Removal of COD and nitrogen in wastewater using sequencingbatch reactor with fibrous packing[J].Wat.Sci.Tech.,1993,28,7:125~131.

引证文献5

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部