摘要
企业定额在我国推行工程量清单计价模式推行的过程中发挥着重要的作用,对于现阶段企业定额的编制问题,从宏观的角度,本文运用博弈论对此进行了分析,得出了阻碍企业定额编制的几个方面的问题。
Corporation quota plays an important role in the implementation of the code of the bill-of-quantity. The problem of corporation quota was analyzed using the game theory from a macro point of view in the paper, and it has reached the problem blocking several aspect of corporation quota establishment.
出处
《建筑经济》
北大核心
2008年第S1期367-369,共3页
Construction Economy