摘要
文章总结和评述了铁路路基翻浆冒泥的现象,提出运用石灰桩处理这一现象的方法,并通过承载力板静载试验确定处理效果。
After summarizing and commenting on the phenomenon of mud pumping in railway subgrade,the Article presents a method to deal with this phenomenon by means of lime pile.It also verifies the treating effect through static load test on loading plate.
出处
《西部交通科技》
2007年第5期51-54,共4页
Western China Communications Science & Technology
关键词
铁道工程
路基翻浆冒泥
石灰桩
复合地基
Railway engineering
Mud pumping
Lime pile
Composite foundation