摘要
采用水下电视系统对隔河岩水电站大坝消力池结构进行了详细检查,查明了表层混凝土的磨蚀及接缝缝口破损、左右边贴坡脚开裂和压裂等情况。描述了杂物、裂缝及蚀坑的位置与程度,反映了水舌跌落区冲蚀及裂缝状况,为消力池运行状态的整体评价和管理提供了可靠的依据。
An underwater television camera is used to find out the damaged places of concrete facing of the stilling basin,the wrecked filler of the joints and the cracks at the feet of both sideslope to be the basic data for overall appraising the operation situation of the stilling basin,and for working out control program.
出处
《湖北水力发电》
2005年第3期58-59,67,共3页
Hubei Water Power
关键词
隔河岩水电站
消力池
水下电视
缺陷检查
Geheyan hydroproject,stilling basin,under water television,damage inspection