2[1]Ginsburg J.Manufacturing:Once is not enough[J].Business Week,2001,(16):128-129.
3[2]Fleischmann M,Krikke H R,Dekker R,Flapper SDP.A characterization of logistics networks for product recovery[J].Omega,2000,28(6):653-666.
4[3]Guide V D R,Jayaraman V,Linton J D.Building contingency planning for closed-loop supply chains with product recovery[J].Journal of Operations Management,2003,21(3):259-279.
5[6]Savaskan R C,Bhattacharya S,Van Wassenhove LN.Closed-loop supply chain models with product remanufacturing[J].Management Science,2004,50(2):239-252.
6Russell Cooper and Thomas W.Ross.Product warranties and double moral hazard[J].Rand Journal of Economics,1985,16 (1):103-113.
7Von Colane,E.Economic product control by routine testing of small samples[J].The Statistician,1988,37:333-341.
8Chew,W.B.and G P.Piano.Vertical integration,long term contracts,and cost of Quality[Z].Harvard Business School Working Paper,1990.
9Balachandran,Kashi R.Radhakrishnan,Suresh.Quality implicationsof warranties in a supply chain[J].Management Scienc,2005,51 (8):1266-1277.
10Reyniers.D.J..Supplier-customer interaction in quality control[J].Annals of Operations Research,1992,34:307-330.