如何处理淤泥等软土地基一直是滨海路基工程中的难点问题。结合青岛海湾大桥李村河互通立交工程实践,简述了抛石挤淤+强夯置换方法的设计参数、施工工艺及监测要求。
Soft soil foundation treatment of sea subgrade has been a difficult engineering problem.Combined with Qingdao Bay Bridge's LI Cun River interchange engineering,the paper introduces the design parameters,construction technology and monitoring requirements of dumping rockfill and extruding silt and dynamic replacement method.
关键词
淤泥质亚粘土
抛石挤淤
强夯置换
muddy loam
dumping rockfill and extruding silt
dynamic replacement