新建太兴铁路Ⅴ级围岩黄土段隧道支护参数研究 被引量:3

Research on Supporting Parameters of Loess Tunnel of V-grade Surrounding Rock on New Taiyuan-Xingxian Railway
下载PDF
导出
摘要 结合新建太原至兴县铁路工程黄土隧道的设计,研究了普速双线铁路Ⅴ级围岩黄土隧道支护参数的合理性。通过数值分析的方法,对初期支护以及二次衬砌进行了理论分析和结构验算及工程类比法验证,得出取消拱部系统锚杆,增加锁脚锚管,初喷C25混凝土厚25 cm,Ⅰ20型钢支撑间距0.6~0.8 m,是安全可靠的。经施工实践验证,取得了良好的效果。 This paper,in combination with the design for loess tunnel on newly built Taiyuan-Xingxian Railway,researches into the rationality of supporting parameters of loess tunnel of V-grade surrounding rock for normal speed double-line railway.By means of numerical analysis,this paper performs the theoretical analysis,structural calculation and engineering analogy for the initial support and secondary lining,and reaches a conclusion that these measures are safe and reliable,such as canceling the rock bolts system of the arch,increasing the feet-locking anchor pipe,using the initial spraying of C25 concrete of 25 cm thick and supporting by I-20 structural steel under 0.6~0.8 m spacing between each other.Construction practice proves that the effects are good.
作者 贾亮 戚铁
出处 《铁道标准设计》 北大核心 2012年第9期85-88,共4页 Railway Standard Design
关键词 太兴铁路 黄土隧道 结构计算 锚杆 监控量测 Tayuan-Xingxian Railway tunnel in loess structure calculation rock bolt monitoring and measurement
  • 相关文献

参考文献11

  • 1中铁工程设计咨询集团有限公司太原设计院.新建太兴铁路地勘实验报告[R]太原:中铁工程设计咨询集团有限公司太原设计院,2009.
  • 2中华人民共和国铁道部.铁路隧道设计规范[S]北京:中国铁道出版社,2005.
  • 3王晓州.大断面黄土隧道建设技术[M]北京:中国铁道出版社,2009.
  • 4铁道第二勘测设计院.铁路工程设计技术手册[M]北京:中国铁道出版社,1995.
  • 5李志业;曾艳华.地下结构设计原理与方法[M]成都:西南交通大学出版社,2003.
  • 6杨建民.郑西客运专线超大断面黄土隧道支护参数研究[J].铁道工程学报,2004,21(z1):149-151. 被引量:2
  • 7傅鹤林;郭磊;欧阳刚杰;闻生.大跨度隧道施工力学行为及衬砌裂缝产生机理[M]北京:科学出版社,2009.
  • 8陈建勋,姜久纯,王梦恕.黄土隧道网喷支护结构中锚杆的作用[J].中国公路学报,2007,20(3):71-75. 被引量:54
  • 9潘昌实.隧道力学数值方法[M]北京:中国铁道出版社,1995.
  • 10王明年,郭军,罗禄森,杨建民,喻渝,谭忠盛.高速铁路大断面深埋黄土隧道围岩压力计算方法[J].中国铁道科学,2009,30(5):53-58. 被引量:57

二级参考文献37

共引文献117

同被引文献28

引证文献3

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部