6SIMON F Ruesche, JAN Steuer, KLAUS Jobmann. Increase of Efficiency in Wireless Train Control Systems (ETCS Level 2) by the Use of Actual Packet-Oriented Transmission Concepts [C] // Proceedings of the ASME/IEEE/ ASCE Joint Rail Conference, JRC 2008.
7Wilmington, DE, United States: A,SME, 2008: 327-336. LAURENT Poutas. GPRS for ETCS Feasibility Study Test Campaigns Final Report [R]. Paris.. UIC, 2010.. 1-125.
8ERTMS. ETCS/GSM-R Quality of Service Operational Analysis [R]. Paris.. ERTMS Users Group, 2005 : 57-58.
9UNISIG. SUBSET-093 v2.3 ERTMS/ETCS-Class 1 GSM-R Quality of Service Class 1 Requirements [S]. Paris: ERTMS, 2005.