广州花都亚运新体育馆设计为直径116m、高33.3m的圆形穹顶钢结构,施工难度大且西南角外围吊装受限制,结合结构特点,采用双向旋转累积滑移施工技术,保证了施工质量并加快了施工进度,社会和经济效益显著。
The new stadium of Huadu,Guangzhou Asia Games is designed for the diameter of 116m,high 33.3m round dome of steel.The construction is difficult and the southwest corner of the peripheral lifting has been restricted.The large span dome steel structure uses bidirectional rotary accumulative sliding construction technology,so as to ensure the construction quality and to speed up the construction progress and get significant social and economic benefits.
出处
《广东土木与建筑》
2012年第7期25-28,共4页
Guangdong Architecture Civil Engineering
关键词
大跨度
穹顶钢结构
高空旋转
双向
累积滑移
施工技术
large span
dome steel structure
high-altitude rotation
bidirectional
accumulative sliding