从造价控制角度来说,设计阶段是建设项目投资控制的关键阶段,它规定了建设规模和建设标准,同时也决定了建设项目的投资规模的大小。本文对我国目前设计阶段造价控制中存在的主要问题进行了分析,并提出了大力推行设计招标,积极推行限额设计,应用价值工程进行方案优化等实施造价控制的具体措施,以有效控制造价。
From the aspect of the cost control,the design phase is the crucial stage for the cost control of the whole project. The scale and standard of the construction project and total investment is determined during the design phase.The paper analyses the problems existed in the cost control in the phase of design at present, and puts forward the specific steps of carrying out the cost control from prompting design calling for tender and limit design, and using the value project to optimum the program, to control the cost effectively.
出处
《建筑经济》
2009年第S1期349-351,共3页
Construction Economy
关键词
造价控制
设计阶段
限额设计
价值工程
cost control
design stage
limitation of design cost
value engineering