摘要
建立了中转港堆场堆存多目标优化模型;在满足中转港船舶靠泊要求下制定堆场最佳堆存方案,目标是最小化计划期内堆场的龙门吊使用数量和平衡各个箱区的工作量负荷;在建立和求解模型的基础上,仿真分析了工作量负荷参数,以揭示工作量负荷程度对于龙门吊使用数量和工作分配均衡性的影响。
A multi-objective optimization model for containers stacking in the storage yard of a transshipment port was established. The optimal stacking plan for the storage yard was formulated to meet the requirements of ship berthing,whose objective was to minimize the number of yard cranes used in the storage yard and balance the workload among different blocks during the planning period. Based on the construction and solution of the model,the simulation analysis on the workload parameter was made to discover the influence of workload on the number of yard crane used and the balance of work distribution.
出处
《重庆交通大学学报(自然科学版)》
CAS
北大核心
2013年第6期1275-1278,共4页
Journal of Chongqing Jiaotong University(Natural Science)
基金
上海市教委科研创新项目重点项目(09ZZ208)
浙江省教育厅项目(Y201016471)
关键词
堆场
集装箱
龙门吊
0-1混合整数规划
多目标规划
storage yard
containers
yard crane
0-1 mixed integer programming
multi-objective programming