2McKim R, Hegazy T, Attalla M. Project performance control in reconstruction projects[J]. Journal of Construction Engineering and Management, 2000, 126 (2): 137-141.
3Rwelamila P D, et al. Total systems intervention: An integrated approach to time, cost and quality mawgement[J]. Construction Management and Economics, 1995, 13: 235-241.
4Babu A J G, Suresh N. Project management with time, cost, and quality considerations[ J]. European Journal of Operational Research, 1996, 88 (2): 320-327.
5Do Ba Khang, Yin Mon Myint. Time, cost and quality trade-off in project management: A case study[J]. International Journal of Project Management, 1999, 17(4): 249-256.
6Shih-Wen Hsiao. Fuzzy logic based decision models for product design[J]. International Journal of Industrial Ergonomics, 1998,21: 103-116.
7Butcher WS. Dynamic programming for project cost-time curve.Journal of Construction Division, ASCE 1967, 93 (C01): 59~ 73
8Panagiotakopoulos D. Cost-time model for large CPM project networks. Journal of Construction Engineering and Management, ASCE 1977; 103 (C02): 201~11
9Harris RB. Precedence and Arrow Networking Techniques for Construction. New York: John Wiley, 1978
10Diaz CF, Hadipriono FC. Nondeterministic networking methods. Journal of Construction Engineering and Management,ASCE 1993; 119 (1): 40~57