期刊文献+

广州飞碟训练中心高边坡稳定性分析 被引量:4

Stability analysis of high slope of Guangzhou skeet&tpapshooting training centre
下载PDF
导出
摘要 以广州飞碟训练中心人工高边坡工程为背景,讨论了人工高边坡设计中的若干关键技术问题,介绍了边坡设计方案。基于相同物理模型和边界条件,先后运用不同极限平衡理论分析该高边坡稳定性,分析了不同极限平衡法计算结果的差异和原因,以及极限平衡法在边坡计算中的限制。运用有限元强度折减法进行相同条件下的计算,并对不考虑锚索加固和考虑锚索加固的边坡计算结果进行比较,分析边坡变形特征和破坏机制,指出有限元折减强度法的优势。 Based on the high slope engineering of Guangzhou Skeet & Trapshooting Training Centre,some of the key technique problems of the high slope designing are discussed;and the reinforced design of the high slope is introduced.It is assumed on the same physical model and boundary conditions,the different limit equilibrium methods(LEM) are adopted to analyze the stability of the high slope;and the different results involves different methods are analyzed and the reasons are discussed.Lastly,the finite element method(FEM) based on shear strength reduction technique are adopted;and the unreinforced slope and the reinforced slope are concerned and calculated.It is pointed out that the deformation characteristics and failure mechanism calculated by FEM are different from that’s from LEM because of its principles and assumption.
出处 《岩土力学》 EI CAS CSCD 北大核心 2009年第S1期190-194,共5页 Rock and Soil Mechanics
关键词 岩土力学 边坡设计 花岗岩 极限平衡法 有限元强度折减法 边坡安全系数 rock and soil mechanics slope design granite limit equilibrium method FEM shear strength reduction technique safety factor of slope
  • 相关文献

参考文献8

二级参考文献56

共引文献1985

同被引文献52

引证文献4

二级引证文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部