摘要
介绍了高强低弹混凝土新配比技术、快速拔管施工技术以及墙体质量无损检测技术,这些技术已成功地应用于瀑布沟水电站大坝基础防渗墙工程,为保证该工程施工安全、加快施工进度提供了重要的技术支持,可供同类工程参考。
In this paper,the authors present new technique for mix proportion of concrete with high strength and low elasticity,rapid tube drawing technique and nondestructive test on wall quality.These techniques are successfully applied in construction of impervious wall in dam foundation of Pubugou hydropower station.Engineering technical support is provided to ensure safe construction of the project and accelerate construction progress and experiences are given to the similar projects.