深覆盖层河道高堆石坝基础防渗墙施工技术 被引量:2

Construction Technique for Impervious Wall in Foundation of High Rockfill Dam on River Bed with Deep Overburden
下载PDF
导出
摘要 介绍了高强低弹混凝土新配比技术、快速拔管施工技术以及墙体质量无损检测技术,这些技术已成功地应用于瀑布沟水电站大坝基础防渗墙工程,为保证该工程施工安全、加快施工进度提供了重要的技术支持,可供同类工程参考。 In this paper,the authors present new technique for mix proportion of concrete with high strength and low elasticity,rapid tube drawing technique and nondestructive test on wall quality.These techniques are successfully applied in construction of impervious wall in dam foundation of Pubugou hydropower station.Engineering technical support is provided to ensure safe construction of the project and accelerate construction progress and experiences are given to the similar projects.
出处 《四川水力发电》 2008年第S3期95-98,108+152,共6页 Sichuan Hydropower
关键词 深覆盖层河道 防渗墙工程 高强低弹混凝土 快速拔管施工技术 墙体质量无损检测技术 瀑布沟水电站 river bed with deep overburden impervious wall project concrete with high strength and low elasticity rapid tube drawing technique nondestructive test on wall quality Pubugou hydropower station
  • 相关文献

参考文献6

二级参考文献14

共引文献40

同被引文献9

引证文献2

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部