期刊文献+

某钢箱梁桥上跨既有铁路施工风险分析 被引量:5

Construction Risk Analysis on a Steel Box Girder Bridge Crossing above Existing Railway
下载PDF
导出
摘要 某客运专线钢箱梁桥跨越既有铁路,部分墩身施工邻近既有线且高于既有桥梁顶面,钢箱梁采用顶推法施工。针对该桥施工方案,详细分析了施工工艺特点,对施工风险因素进行了辨识,并用层次分析法对已辨识的风险因素进行了重要性排序。最后,根据研究结果对此次施工提出了一些建议。 A steel box girder bridge on passenger railway line is crossing above the existing railway,and part of the pier construction is adjacent to the existing line and higher than the top surface of existing bridge.So the incremental launching method is used to erect the steel box girder.According to the construction program,the construction process characteristics were analyzed in detail,and the risk factors of construction were identified.And then the importance of the identified risk factors was ranked by the Analytic Hierarchy Process method.Finally,based on the researched conclusions,some suggestions were given for construction of the bridge.
出处 《重庆交通大学学报(自然科学版)》 CAS 北大核心 2013年第S1期879-883,共5页 Journal of Chongqing Jiaotong University(Natural Science)
基金 中央高校基本科研业务基金项目(2011JBM275)
关键词 上跨既有线 顶推施工 风险因素 层析分析法 crossing above existing railway incremental launching construction risk factors Analytic Hierarchy Process(AHP)
  • 相关文献

参考文献6

二级参考文献12

共引文献27

同被引文献9

引证文献5

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部