摘要
本文从景观绿化工程施工阶段的效果控制入手,指出景观绿化设计与施工脱节的问题,以无锡中邦城市项目为例,针对景观工程的特殊性及重要性,阐述了在施工阶段做好施工效果控制的方法。首先,施工的前期对应项目特点制作《景观施工效果控制手册》,召开切实有效的施工交底会,对项目中需使用的物料进行封样等。之后,施工中期效果控制的重点是放线、构筑物比例、地形等的确认。最后,在施工后期相应的阶段组织分部分项验收。施工的各个阶段设计与施工需紧密配合,两者相辅相成,相得益彰,以精工细作的工作态度,实现对景观绿化工程施工的效果控制,力求呈现完美的作品。
From the landscape construction stage of greening project control, this paper points out that the landscape design and construction of disjointed problem. Taking Zobon City in Wuxi as an example, it described the good method of construction control in construction stage in view of the importance and particularity of landscape engineering. First of all, the characteristics of the project construction corresponding production 'Landscape Construction Control Handbook', held the construction work effectively, the sealed sample on the need to use the project material. Then, key construction mediumterm effects of control is to confirm the line, structures, such as the proportion of the terrain. Finally, in the late stage of construction corresponding partial acceptance. Each stage of design and construction need to cooperate, complement each other, to Seiko secret agents working attitude, realize the landscape greening construction effect control, and strive to show perfect work.
关键词
景观绿化设计
施工管理
房地产
乔木
Landscape greening design
Execution control
Real estate
Tree