根据八矿东进风井的现状和工程概况,制定了详细的施工措施和计划,顺利完成了设备的安装和调试,在保证安全生产的前提下使提升能力得到了提高,并为今后类似提升机的安装积累了经验。
According to the current situation and project overview of eight mine east wind, formulate detailed construction measures and plans, complete the installation and commissioning of the equipment successfully. In the guarantee of safe production, increase the lifting capacity, accumulated experience for the future installation of similar hoist.
出处
《煤炭技术》
CAS
北大核心
2015年第3期266-268,共3页
Coal Technology
关键词
提升机
安装设备
调试
运行
hoist
equipment installation
operating