期刊文献+

露天矿生产的车辆安排 被引量:3

Vehicles arrangement model in production scheme of open-pit mine
原文传递
导出
摘要 :分别基于两条原则对露天矿生产的车辆安排问题展开了讨论,建立了多目标非线性整数规划模型.通过采用线性加权法、分离部分控制变量法,以及在一定范围内穷举,将问题简化,进而给出模型的求解方法.不仅解决了具体实例中的问题,而且还给出了更为通用的一般模型及其优化的快速算法. In this paper we discuss the problems of the vehicles arrangement of the production in a strip mine based on two principles, and set up a multi-objective nonlinear integer programming model. We simplify the problems by using the linear weighted method, separate technique of partial control variables, and enumerating in certain range, then give out the solving plan of the model. This paper not only solves the problems from the actual cases which came from the problems, but also presents a more universal fast algorithm to general model and its optimization.
出处 《大连海事大学学报》 CAS CSCD 北大核心 2004年第3期100-102,共3页 Journal of Dalian Maritime University
关键词 露天矿生产 车辆安排 多目标规划 非线性规划 整数规划 production of open-pit mine vehicles arrangement multi-objective programming nonlinear programming integer programming
  • 相关文献

同被引文献33

引证文献3

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部