期刊文献+

CNC机床中刀具交换问题的启发式算法

A Heuristic Algorithm for Tool Switching Problem on CNC Machine Tool
下载PDF
导出
摘要 刀具交换问题是指在一台CNC机床上加工N个作业时,在优化作业加工次序和刀具装载策略的过程中,使CNC机床的换刀次数最少。为了有效地搜索到刀具交换问题的优化解,本文提出了基于定向搜索的启发式算法的求解方法。通过实验数据的验证,本文提出的算法具有简单、计算速度快以及效率高的特点。 A key problem of computer numerical control machine tool switching is to determine the jobs' sequence and tool loading policy in order to minimize the total number of tool switches in the planning periodic horizon. In order to search for the optimizing solutions of tool switching problem effectively, a beam search based heuristic algorithm is put forward for formulating heuristic solution space of the problem. The proposed algorithm is tested on some experimental data, and the results show that the heuristic algorithm has the characteristics of high computational speed, briefness and efficiency.
出处 《计算机集成制造系统-CIMS》 EI CSCD 北大核心 2004年第5期574-578,共5页
基金 国家863/CIMS主题资助项目(2003AA414120) 上海市高校科技发展基金项目(02FK04)。~~
关键词 计算机数控机床 启发式算法 刀具交换 定向搜索 computer numerical control machine tool heuristic algorithm tool switches beam search
  • 相关文献

参考文献9

  • 1周炳海,施海锋,蔡建国.FMS计划中的零件分批和机床负荷分配集成算法[J].组合机床与自动化加工技术,2001(11):1-4. 被引量:2
  • 2CRAMA Y,KOLEN A W J,OERLEMANS A G,SPIEKSMA F C R.Minimizing the number of tool switches on a flexible machine[J].International Journal of Flexible Manufacturing Systems,1994,6 (1):33-54.
  • 3BARD J F.A heuristic for minimizing the number of tool switches on a flexible machine[J].IIE Transactions,1988,20(4):382-391.
  • 4TANG C S,et al.Models arising from a flexible manufacturing machine.Part I:Minimization of the number of tool switches[J].Operations Research,1988,36(5):767-777.
  • 5HERTZ A,LAPORTE G,MITTAZ M,et al.Heuristics for minimizing tool switches when scheduling part types on a flexible machine[J].IIE Transactions,1998,30(8):689-694.
  • 6HOUSNI D,et al.A new heuristic based on a hypergraph representation for the tool switching problem[J].International Journal of Production Economics,2000,64(1-3):165-176.
  • 7AL-FAWZAN M A,et al.A tabu search based algorithm for minimizing the number of tool switches on a flexible machine[J].Computers & Industrial Engineering,2003,44(1) :35-47.
  • 8SABUNCUOGLU I,et al.A beam search-based algorithm and evaluation of scheduling approaches for flexible manufacturing systems[J].IIE Transactions,1998,30(2):179-191.
  • 9周炳海,周晓军,蔡建国,冯坤.A Beam Search-based Algorithm for Flexible Manufacturing System Scheduling[J].Journal of Donghua University(English Edition),2002,19(3):13-18. 被引量:2

二级参考文献13

  • 1Stecke K E.Formulation and solution of nonlinear integer production planning problems in manufacturing systems[].Management Science.1983
  • 2Chen F F,Ker J I and Klawpatinon K.An effective part-selection model for production planning of flexible manufacturing systems[].International Journal of Production Research.1995
  • 3Tiwari M K and Vididyarthi N K.Solving mahine loading problems in a flexible manufacturing system using a genetic algorithm based heuristic approach[].International Journal of Production Research.2000
  • 4Nayak GK and Acharya D.Part type selection, machine loading and part type volume determination problems in FMS planning[].International Journal of Production Research.1998
  • 5G. Andreatta,L. Deserti,L. N. Giraldo.Scheduling algorithms for a two-machine flexible manufacturing system[J].International Journal of Flexible Manufacturing Systems.1995(3)
  • 6RachamaduguR,SteckeKE.ProductionPlanningandControl[]..1994
  • 7BasnetC,MizeJH. InternationalJournalofComputerIntegratedManufacturing . 1994
  • 8SabuncuogluI,BayizM. EuropeanJournalofOperationalRe search . 1999
  • 9OwPS,MortonTE. InternationalJournalofProductionRe search . 1988
  • 10K .Shanker,BKandModi. EuropeanJournalofOperationalRe search . 1999

共引文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部