摘要
本文叙述了荣成万吨级反渗透海水淡化示范工程项目第一期工程的工艺设计,设备配置,系统控制和平面布置的基本情况。通过对该反渗透海水淡化系统的调试和试运行,结果表明该系统运行参数稳定,设备运行正常,性能指标达到设计要求,产品水符合国家生活饮用水标准。根据该项目投资和当地情况,概要地分析了该系统的造水成本,经济和社会效益。
This paper describes the process design,equipment matching,system control and layout of the first phase of the 10000 m3/d scale reverse osmosis sea water desalination pilot project in Rongcheng.Through the start up and test operating of the said system,it is shown that the system operates with stable operating parameters,the equipments run regularly,the performances reach the design requirements and the produced water meets the national standard for drinking water.According to the local conditions,the water making cost, economic and social benefits are essentially analyzed.
出处
《水处理技术》
CAS
CSCD
北大核心
2004年第3期157-161,共5页
Technology of Water Treatment
基金
国家发改委高技术产业化发展项目(20012089)