期刊文献+

调整柱距处理岩溶塌陷地基的距离 被引量:5

Adjusting column distance in karst collapse foundation treatment
下载PDF
导出
摘要 在已稳定的塌陷地基中,根据塌陷土体所能提供的被动土压力强度与地基土体所产生的主动土压力强度来判别地基未塌陷土体的局部稳定性.算例分析表明,采用调整柱基础距离或调整基础埋深,可保证地基土体不破坏;地下水位的升降对地基未塌陷土体的局部稳定性的影响显著,地下水位上升不利于地基的稳定性.根据极限平衡条件推导出新的方法,可用以判定地基未塌陷土体的整体稳定性. In stabilized collapse foundation,based on the passive earth pressure strength from the collapse soil and the active earth pressure strength from the foundation soil, the partial stability of foundation soil can be determined.Through the analysis of engineering calculating cases, when the column distance is adjusted or the foundation embedment is changed, the foundation soil will not be destroied. The effect on the partial stability of foundation soil is obvious because of the variation of groundwater level.The rising of groundwater indicates disadvantage for foundation stability.With the method deduced by the limit equilibrium condition, the foundation stability can be determined.
出处 《桂林工学院学报》 2004年第3期307-310,共4页 Journal of Guilin University of Technology
基金 广西自然科学基金资助项目(桂科自0229055) 广西区教育厅资助项目(桂教科研[2002]316)
关键词 柱距调整 岩溶 塌陷 地基稳定性 adjusting column distance karst collapse foundation stability
  • 相关文献

参考文献4

二级参考文献1

  • 1高武振,桂林市西城区地下水污染和塌陷预测与对策研究,1994年,36页

共引文献67

同被引文献47

引证文献5

二级引证文献30

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部