期刊文献+

业务流程管理系统中的时间约束问题

Time Constraint in Business Process Management System
下载PDF
导出
摘要 业务流程管理中的时间约束(TC)分活动执行和活动结束两类,前者TC活动的开始执行时间不得迟于该时间约束指定的时刻,后者TC活动的执行结束时间不得迟于该时间约束指定的时刻。结合BizPro系统,其时间约束和异常处理建模,采用符合执行定义信息的基于XML表示法或完全等效的基于业务流程表示法。时间约束的实现依赖于流程中TC活动和参照活动的执行状态,涉及业务流程实例线程和时间约束监听线程。 Time constraint (TC) in business process management system (BPMS) can be divided into schedule time constraint and implement time constraint. The former, beginning time of TC activity is early as appointed time of schedule time constraint, and the latter, ending time of TC activity is early as appointed end time of implement time constraint. Modeling methods for TC and exception handling in the BizPro system were applied, them are up to the XML representation and equivalent business process representation defined by implement time constraint. TC was implemented by according to implement states of TC activity and reference activity, and thread of business process example and monitoring thread of TC.
出处 《兵工自动化》 2004年第5期21-23,共3页 Ordnance Industry Automation
基金 国家十五科技攻关项目<基于中间件的电子商务系统集成技术>资助(2001BA202A01)
关键词 业务流程管理 时间约束 BizPro系统 Business process management Time constraint BizPro system
  • 相关文献

参考文献7

二级参考文献18

  • 1戴建设,何勇,王红卫.多供需点快速调运问题研究[J].系统工程学报,1995,10(3):124-130. 被引量:5
  • 2范玉顺.工作流管理技术基础--实现企业业务过程重组.过程管理与业务过程自动化的核心技术[M].北京:清华大学出版社/施普林格出版社,2001.110-169.
  • 3张和邦 陈孝思.复杂道路网中一种新的最速调动方法[M].重庆后勤工程学院,1996(5).8-11.
  • 4[1]John A Stankovic. Misconceptions About Real-Time Computing[J].IEEE transactions on computers, 1988: 10~19
  • 5[2]K Ramamritham,J A Stankovic. Scheduling Algorithms and Operating System Support for Real-Time Systems[C].In :Proc IEEE, 1994 ;82 ( 1 ): 55~67
  • 6[3]Dertouzos M L,Aloysius Ka-Lau Mok. Mutiprocessor on-line scheduling of hard-real-time tasks[J].IEEE transactions on Software Engineer ing, 1993; 19 (1) :70~84
  • 7[4]Terry Shepard,Martin Gagné.A Pre-run-time Scheduling Algorithm For Hard Real-Time Systems[J].IEEE transactions on Software Engineering, 1991; 17(7) :669~677
  • 8[5]J P C Verhoosel,D K Hammer,E Y Luit et al.A Model for Scheduling Object-based Distributed Real-Time Systems[J].J Real-Time Sys tems, 1995; 8 ( 1 ): 5~34
  • 9[6]Santhoshkumar I,Manimaran G,Siva ram Murthy C.A Pre-run-time Scheduling Algorithm For Object-Based Distributed Real-Time Systems[C].In:Proc 1997 Joint Workshop on Parallel and Distributed RealTime Systems, 1997:260~267
  • 10[7]Santhoshkumar I,Manimaran G,Siva Ram Murthy C.A Pre-run-time scheduling algorithm for object-based distributed real-time systems[J]. Journal of Systems Architecture, 1999 ;45 (14): 1169~ 1188

共引文献59

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部