摘要 以六西格玛质量管理理论为基础 ,针对梅山炼钢厂已有的生产管理数据进行了深入的挖掘和开发。利用SQL -Server2 0 0 0搭建了开发软件的后台数据库 ,用PowerBuilder8.0设计了前台软件界面 ,并通过开放式数据接口 (ODBC)技术实现了与生产管理数据库的实时连接。开发的软件系统通过对数据报表的多种图形显示分析、生产过程能力分析和生产过程中的成本构成分析 ,进一步挖掘了已有数据的潜在价值 ,从而为企业各级进行生产管理决策 ,提高生产能力 ,改进产品质量 ,降低生产成本提供了有力的定量、定性的技术支撑 。 Based on 6-σ quality control theory, the existed production dada excavation and application had been done deeply for Meishan steel-making factory. By utilizing the SQL-Server2000 to construct the background database, the PowerBuilder 8.0 to construct the front software interface, and linking the software with the real-time database by the Opened ODBC technology, the developed software explored the latent values of those data through the display of table or graphs of production data, the analysis of the process ability and the prediction of producing costs. Therefore, it will provide a strong basis for companies to make critical decision-miking, enhance the producing ability, improve the quality of products and also reduce the costs of producing process, and avoid the former blindness decision-making.
出处 《冶金设备》 2004年第5期1-4,共4页 Metallurgical Equipment
基金 国家"十五"科技攻关计划资助项目 ( 2 0 0 1BA2 0 6A)
关键词 六西格玛 生产决策 数据挖掘 过程能力 排列图 theory Production decision Data excavation Process ability Pareto chart
  • 相关文献

参考文献10

  • 1唐晓芬.六西格玛核心教程[M].北京:中国标准出版社,2002..
  • 2MeClanhan D.Power Builder 6开发实用大全[M].北京:水利出版社,1999..
  • 3Willian B, Heys. Special Edition using PowerBuilder Que Corporation, 1998.
  • 4Expressive power of SQ1 Libkin L (Toronto University,Canada), Theoretical Computer Science ; 14 Mar 2003 ;Vo1:296 No. 3.
  • 5Jim Brwone, et. al. Production Management Systems - A CIM Perspective[ M]. Addision - Wesley,1988.
  • 6System Software Associates, INC. , BPCS Client/Server Distributed Objiect Computing Architecture [ M ] , 1995.
  • 7Database language SQ1 Category: Software Standard.Subcategory: datebase June 1993. National Inst. of Standards and Technology; 2 Jun 1993.
  • 8宝钢集团梅山公司.信息化建设工程可行性研究报告[R].,2002.27-28.
  • 9GallagherS,Herbert S.PowerBuilder6.0 Unleashed M].Beijing:Mechine Industry Publishing House 1998:361—458.
  • 10Rick Snodgrass.Querying valid—time state tables.database Programming&Design,1998.11(7)60—62.

共引文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部